• FY 2017: UofU Learning Spaces Scheduled for A/V Refurbishment by TLT

The following list of University of Utah Learning Spaces that are scheduled for A/V Refurbishment by Teaching & Learning Technologies is updated frequently as room priorities change or configurations are altered.

This list of Learning Spaces designates refurbishments for Fiscal Year 2017.

The University of Utah maintains almost 1300 buildings and structures across the campus and related areas. For academic and research buildings, many contain learnings spaces (classrooms, auditoriums, labs, conference rooms, seminar rooms, etc.) that are considered "General Access," meaning these facilities are open to scheduling and use by any campus organization or department. This type of access makes these rooms eligible for centralized design, management, and refurbishment for any A/V technologies that are installed. Many are also eligible for continuing maintenance.

 

   GENERAL ACCESS LEARNING SPACES SCHEDULED FOR A/V EQUIPMENT REFURBISHMENT


Fiscal Year 2017
Refurbishment Costs = $433,521

Access other Fiscal Year Refurbishments

 

 INDEX TO BUILDINGS
(click on a building to view its A/V equipped rooms)
( * indicates there are rooms in that building to be refurbished)

AEB: Alfred Emery Building #008
ANNEX #105
*ARCH: Architecture Building #037
*ART: Art Building #038
ASB: Aline Wilmot Skaggs Biology Building #082
BEHS: Social & Behavioral Sciences Building #025
BEHS (S BEH): Social & Behavioral Sciences Lecture Hall #027
BUC: Business Classroom Building #074
CRCC: C. Roland Christensen Center #077
CTIHB: Carolyn Tanner Irish Humanities Building #045
*FASB: Frederick Albert Sutton Building #012
FMAB: Film & Media Arts Building #036
HEB: Henry Eyring Chemistry Building #085
HPR E: Health-Physical Education-Recreation East Building #091
*HPR N: Health-Physical Education-Recreation North Building #092
*HPR W: Health-Physical Education-Recreation West Building #094
*HSEB: Health Sciences Education Building #575
JFB: James C. Fletcher Building #083
*JTB: James Talmage Building #014
JWB: John A. Widtsoe Building #009
LCB: LeRoy E. Cowles Building #013
LNCO: Language & Communication Building #049
LS: Life Science Building #007
MBH: Milton Bennion Hall #065
MCD: Alice Sheets Marriott Center for Dance #028
MEB: Joseph F. Merrill Engineering Building #064
MLIB: J. Willard Marriott Library #086
NS: Naval Science Building #043
OSH: Orson Spencer Hall #054 (demolition and rebuild starts in 2016)
PAB: Performing Arts Building #017
ST: William Stewart Building #006
*SW: College of Social Work #026
WBB: William C. Browning Building #011
WEB: John and Marva Warnock Engineering Building #062
*WEB/EMCB: Jon and Marva Warnock Engineering Building #063

 

 

 

 

AEB: Alfred Emery Building (#008)
No TLT refurbishments scheduled.

Campus Map Location
ROOM NUMBER CAPACITY SQUARE FOOTAGE REFURBISHMENT COST
306 35 483 sq ft NA 
310 50 720 sq ft NA 
320 71 1183 sq ft NA 
340 43 860 sq ft NA 
350 64 1042 sq ft NA 
360 30 549 sq ft NA 

Return to Index of Buildings 

 

 

ANNEX: Annex Building (#105)
No TLT refurbishments scheduled.

Campus Map Location
ROOM NUMBER CAPACITY SQUARE FOOTAGE REFURBISHMENT COST
2036 30 516 sq ft NA 

 Return to Index of Buildings

 

 

*ARCH: Architecture Building (#037)

Campus Map Location
ROOM NUMBER CAPACITY SQUARE FOOTAGE REFURBISHMENT COST
229 36 480 sq ft $13,674

Return to Index of Buildings 

 

 

*ART: Art Building (#038)

Campus Map Location
ROOM NUMBER CAPACITY SQUARE FOOTAGE REFURBISHMENT COST
158 83 905 sq ft $13,674

Return to Index of Buildings 

 

 

ASB: Aline Wilmot Skaggs Biology Building (#082)
No TLT refurbishments scheduled.

Campus Map Location
ROOM NUMBER CAPACITY SQUARE FOOTAGE REFURBISHMENT COST
220 348 3991 sq ft NA 

Return to Index of Buildings 

 

 

BEHS: Social & Behavioral Sciences Building (#025)
No TLT refurbishments scheduled.

Campus Map Location
ROOM NUMBER CAPACITY SQUARE FOOTAGE REFURBISHMENT COST
102 70 898 sq ft NA 
104 42 544 sq ft NA 
105 42 544 sq ft NA 
106 42 544 sq ft NA 
107 42 544 sq ft NA 
108 42 544 sq ft NA 
109 40 753 sq ft NA 
110 110 1309 sq ft NA 
111 42 514 sq ft NA 
112 99 139 sq ft NA 
113 42 523 sq ft NA 
114 70 898 sq ft NA 
115 70 898 sq ft NA 
116 70 898 sq ft NA 

 Return to Index of Buildings

 

 

BEHS (S BEH): Social & Behavioral Sciences Lecture Hall (#027)
No TLT refurbishments scheduled.

Campus Map Location
ROOM NUMBER CAPACITY SQUARE FOOTAGE REFURBISHMENT COST
101 auditorium 399 4088 sq ft NA 

Return to Index of Buildings 

 

 

BUC: Business Classroom Building (#074)
No TLT refurbishments scheduled.

Campus Map Location
ROOM NUMBER CAPACITY SQUARE FOOTAGE REFURBISHMENT COST
105 62 798 sq ft NA 
106 56 780 sq ft NA 
107 56 778 sq ft NA 
108 40 792 sq ft NA 
203 56 780 sq ft NA 
204 22 804 sq ft NA 
206 32 580 sq ft NA 
207 32 479 sq ft NA 
208 42 798 sq ft NA 
210 48 681 sq ft NA 
211 50 681 sq ft NA 
212 56 668 sq ft NA 
301 40 1052 sq ft NA 
302 40 621 sq ft NA 
303 50 982 sq ft NA 
304 40 623 sq ft NA 

Return to Index of Buildings 

 

 

CRCC: C. Roland Christensen Center (#077)
No TLT refurbishments scheduled.

Campus Map Location
ROOM NUMBER CAPACITY SQUARE FOOTAGE REFURBISHMENT COST
115 102 1948 sq ft NA 
215 102 1897 sq ft NA 

 Return to Index of Buildings

 

 

CTIHB: Carolyn Tanner Irish Humanities Building (#045)
No TLT refurbishments scheduled.

Campus Map Location
ROOM NUMBER CAPACITY SQUARE FOOTAGE REFURBISHMENT COST
101 80 1281 sq ft NA 
109 165 2465 sq ft NA 

 Return to Index of Buildings

 

 

*FASB: Frederick Albert Sutton Building (#012)

Campus Map Location
ROOM NUMBER CAPACITY SQUARE FOOTAGE REFURBISHMENT COST
101 30 754 sq ft $13,674
250 36 951 sq ft $13,674
295 76 1096 sq ft $16,743

Return to Index of Buildings 

 

 

FMAB: Film & Media Arts Building (#036)
No TLT refurbishments scheduled.

Campus Map Location
ROOM NUMBER CAPACITY SQUARE FOOTAGE REFURBISHMENT COST
0001 auditorium 416 4543 sq ft NA 

Return to Index of Buildings 

 

 

HEB: Henry Eyring Chemistry Building (#085)
No TLT refurbishments scheduled.

Campus Map Location
ROOM NUMBER CAPACITY SQUARE FOOTAGE REFURBISHMENT COST
2002 26 428 sq ft NA 
2004 203 2087 sq ft NA 
2006 75 783 sq ft NA 
2008 348 3410 sq ft NA 
2010 26 419 sq ft NA 
xxx xx x sq ft NA 

Return to Index of Buildings 

 

 

HPR E: Health-Physical Education-Recreation East Building (#091)
No TLT refurbishments scheduled.

Campus Map Location
ROOM NUMBER CAPACITY SQUARE FOOTAGE REFURBISHMENT COST
206 186 1891 sq ft NA 

Return to Index of Buildings 

 

 

*HPR N: Health-Physical Education-Recreation North Building (#092)

Campus Map Location
ROOM NUMBER CAPACITY SQUARE FOOTAGE REFURBISHMENT COST
218 50 924 sq ft NA 
225 40 962 sq ft NA 
226 28 568 sq ft $13,674
236 55 782 sq ft $13,674
237 14 523 sq ft $13,674
238 106 1090 sq ft $16,743
242 40 918 sq ft NA 

Return to Index of Buildings 

 

 

*HPR W: Health-Physical Education-Recreation West Building (#094)

Campus Map Location
ROOM NUMBER CAPACITY SQUARE FOOTAGE REFURBISHMENT COST
117 78 1134 sq ft $13,674

Return to Index of Buildings 

 

 

*HSEB: Health Sciences Education Building (#575)

Campus Map Location
ROOM NUMBER CAPACITY SQUARE FOOTAGE REFURBISHMENT COST
1007     NA 
1100     NA 
1120     NA 
1130     NA 
1140     NA 
1700     NA 
1730     NA 
1750     NA 
2110     NA 
2120     NA 
2600     $13,674 
2680     $13,674 
2908     NA 
2912     NA 
2928     NA 
2929     NA 
2931     NA 
2938     NA 
2948     NA 
2957     NA 
2958     NA 
2962     NA 
2968     NA 
2969     NA 
2971     NA 
3420     NA 
3430     NA 
3100A     NA 
3100B     NA 
3100C     NA 
3100D     NA 
3515A     NA 
3515B     NA 
3515C     NA 
3515D     NA 
4100A     NA 
4100B     NA 
4100C     NA 
4100D     NA 
4300A     $7,500 
4300AM     $13,674 
4300B     $7,500
4300C     $7,500
4300D     $7,500
4300E     $7,500
4300F     $7,500
4300G     $7,500
4300H     $7,500
4300J     $7,500
4300K     $7,500
4300L     $7,500
4300M     $7,500
5100A      NA
5100B     $13,674 
5100C      NA
5100D      NA

Return to Index of Buildings 

 

 

JFB: James C. Fletcher Building (#083)
No TLT refurbishments scheduled.

Campus Map Location
ROOM NUMBER CAPACITY SQUARE FOOTAGE REFURBISHMENT COST
101 202 1608 sq ft NA 
102 92 1242 sq ft NA 
103 202 3185 sq ft NA 
B-1 52 714 sq ft NA 

Return to Index of Buildings 

 

 

*JTB: James Talmage Building (#014)

Campus Map Location
ROOM NUMBER CAPACITY SQUARE FOOTAGE REFURBISHMENT COST
110 42 668 sq ft  NA
120 42 621 sq ft NA 
130 102 1282 sq ft $16,743
140 128 1979 sq ft $16,743
310 232 2369 sq ft NA 
320 42 647 sq ft NA 

Return to Index of Buildings 

 

 

JWB: John A. Widtsoe Building (#009)
No TLT refurbishments scheduled.

Campus Map Location
ROOM NUMBER CAPACITY SQUARE FOOTAGE REFURBISHMENT COST
208 28 374 sq ft NA 
308 28 374 sq ft NA 
333 30 415 sq ft NA 
335 179 1866 sq ft NA 

Return to Index of Buildings 

 

 

LCB: LeRoy E. Cowles Building (#013)
No TLT refurbishments scheduled.

Campus Map Location
ROOM NUMBER CAPACITY SQUARE FOOTAGE REFURBISHMENT COST
121 30 669 sq ft NA 
215 50 679 sq ft NA 
219 86 936 sq ft NA 
222 32 432 sq ft NA 
225 47 669 sq ft NA 
323 28 477 sq ft NA 

Return to Index of Buildings 

 

 

LNCO: Language & Communication Building (#049)
No TLT refurbishments scheduled.

Campus Map Location
ROOM NUMBER CAPACITY SQUARE FOOTAGE REFURBISHMENT COST
1100 73 767 sq ft NA 
1110 135 1245 sq ft NA 

Return to Index of Buildings 

 

 

LS: Life Science Building (#007)
No TLT refurbishments scheduled.

Campus Map Location
ROOM NUMBER CAPACITY SQUARE FOOTAGE REFURBISHMENT COST
101 30 785 sq ft NA 
102 30 776 sq ft NA 
107 35 830 sq ft NA 
111 35 830 sq ft NA 

Return to Index of Buildings 

 

 

MBH: Milton Bennion Hall (#065)
Demolition begins early 2017.

Campus Map Location
ROOM NUMBER CAPACITY SQUARE FOOTAGE REFURBISHMENT COST
101 45 792 sq ft NA 
102 45 1042 sq ft NA 
104 45 1116 sq ft NA 
105 45 701 sq ft NA 
111 50 674 sq ft NA 
112 65 1039 sq ft NA 
113 75 1054 sq ft NA 
114 45 1039 sq ft NA 
201     NA 
204 25 747 sq ft NA 
212 40 961 sq ft NA 
302 75 1033 sq ft NA 
309     NA 
311     NA 

Return to Index of Buildings 

 

 

MCD: Alice Sheets Marriott Center for Dance (#028)
No TLT refurbishments scheduled.

Campus Map Location
ROOM NUMBER CAPACITY SQUARE FOOTAGE REFURBISHMENT COST
130 30 378 sq ft NA 
230 30 402 sq ft NA 

Return to Index of Buildings 

 

 

MEB: Joseph F. Merrill Engineering Building (#064)
No TLT refurbishments scheduled.

Campus Map Location
ROOM NUMBER CAPACITY SQUARE FOOTAGE REFURBISHMENT COST
1225 21 434 sq ft NA 
2325 49 1025 sq ft NA 

 Return to Index of Buildings

 

 

MLIB: J. Willard Marriott Library (#086)
No TLT refurbishments scheduled.

Campus Map Location
ROOM NUMBER CAPACITY SQUARE FOOTAGE REFURBISHMENT COST
1130 93 1608 sq ft NA 
1150 93 1641 sq ft NA 
1715 40 740 sq ft NA 
1725 40 742 sq ft NA 

Return to Index of Buildings 

 

 

NS: Naval Science Building (#043)
No TLT refurbishments scheduled.

Campus Map Location
ROOM NUMBER CAPACITY SQUARE FOOTAGE REFURBISHMENT COST
105     NA 
202 20 319 sq ft NA 
203 55 831 sq ft NA 
204 50 722 sq ft NA 
205 45 640 sq ft NA 

Return to Index of Buildings 

 

 

OSH: Orson Spencer Hall (#054)
Demolition and rebuild Starts after Summer Semester 2016

Campus Map Location

OSH Classroom Scheduling Plan

ROOM NUMBER CAPACITY SQUARE FOOTAGE REFURBISHMENT COST
101 24 485 sq ft NA 
102 55 834 sq ft NA 
103 35 576 sq ft NA 
104 55 769 sq ft NA 
105 20 378 sq ft NA 
106 50 803 sq ft NA 
107 60 789 sq ft NA 
111 50 671 sq ft NA 
113 60 796 sq ft NA 
130 40 580 sq ft NA 
131 40 556 sq ft NA 
132 40 572 sq ft NA 
133 40 574 sq ft NA 
134 40 572 sq ft NA 
135 40 574 sq ft NA 
136 40 574 sq ft NA 
137 40 586 sq ft NA 
138 40 588 sq ft NA 
175 120 1194 sq ft NA 
202 113 1355 sq ft NA 
204 45 672 sq ft NA 
229 18 289 sq ft NA 
230 18 289 sq ft NA 
231 40 557 sq ft NA 
232 40 578 sq ft NA 
233 40 574 sq ft NA 
234 40 576 sq ft NA 
235 40 578 sq ft NA 
236 40 578 sq ft NA 
237 40 588 sq ft NA 
238 40 594 sq ft NA 
275 25 538 sq ft NA 
200 auditorium 405 4035 sq ft NA 

Return to Index of Buildings 

 

 

PAB: Performing Arts Building (#017)
No TLT refurbishments scheduled.

Campus Map Location
ROOM NUMBER CAPACITY SQUARE FOOTAGE REFURBISHMENT COST
103 99 1341 sq ft NA 

Return to Index of Buildings 

 

 

ST: William Stewart Building (#006)
No TLT refurbishments scheduled.

Campus Map Location
ROOM NUMBER CAPACITY SQUARE FOOTAGE REFURBISHMENT COST
205 50 868 sq ft NA 
208 50 868 sq ft NA 
214 35 578 sq ft NA 
215 35 463 sq ft NA 
216 35 556 sq ft NA 
104 auditorium 100 1641 sq ft NA 

Return to Index of Buildings 

 

 

*SW: College of Social Work (#026)

Campus Map Location
ROOM NUMBER CAPACITY SQUARE FOOTAGE REFURBISHMENT COST
131 56 881 sq ft $13,674
132 24 383 sq ft $13,674
133 60 783 sq ft $13,674
135 24 371 sq ft $13,674
136 24 383 sq ft $13,674
137 60 875 sq ft  NA
330 28 438 NA 
134 auditorium 232 2440 $16,674

Return to Index of Buildings 

 

 

WBB: William C Browning Building (#011)
No TLT refurbishments scheduled.

Campus Map Location
ROOM NUMBER CAPACITY SQUARE FOOTAGE REFURBISHMENT COST
206 25 368 sq ft NA 
207 45 570 sq ft NA 
517 30 573 sq ft NA 
617 45 574 sq ft NA 

Return to Index of Buildings 

 

 

WEB: John and Marva Warnock Engineering Building (#062)
No TLT refurbishments scheduled.

Campus Map Location
ROOM NUMBER CAPACITY SQUARE FOOTAGE REFURBISHMENT COST
1230 92 2563 sq ft NA 
1248 30 742 sq ft NA 
1250 78 2445 sq ft NA 
1450 22 525 sq ft NA 
1460 22 525 sq ft NA 
2230 88 2580 sq ft NA 
2460 18 525 sq ft NA 
2470 18 522 sq ft NA 
2250 78 2468 sq ft NA 

Return to Index of Buildings 

 

 

*WEB-EMCB: Jon and Marva Warnock Engineering Building (#063)

Campus Map Location
ROOM NUMBER CAPACITY SQUARE FOOTAGE REFURBISHMENT COST
101 208 2470 sq ft NA 
102 93 1612 sq ft NA 
103 136 1822 sq ft NA 
104 262 3104 sq ft NA 
105 145 2469 sq ft NA 
110 60 995 sq ft NA 
112 60 995 sq ft NA 
114 60 995 sq ft NA 
120 50 898 sq ft NA 
122 50 898 sq ft $13,674
126 40 888 sq ft $13,674

 Return to Index of Buildings

 

 

 

Directly below are some interesting links with regard to scheduling spaces and rooms on campus.  Following these links is a list of the General Access Learning Spaces with Installed A/V Technologies that are scheduled for equipment refurbishment. Also included is a link to a list of IVC: Interactive Video Conferencing facilities managed by the University.

List of Centrally Managed Learning Spaces Currently Installed with A/V Equipment, UofU Campus

Scheduling Spaces for Academics and Events (Registrar's Office)

The Astra Scheduling Software for the University of Utah: Guest Portal

Astra Scheduling Software Tutorials and Training Information

Orson Spencer Hall Rebuild and Classroom Scheduling Plans

Milton Bennion Hall Demolition and Classroom Scheduling Plans (TBD)

 

   IVC: INTERACTIVE VIDEO CONFERENCING FACILITIES

The State of Utah offers video and audio interactive conferencing technology for meetings, events and classes. The University of Utah builds and maintains its facilities that connect to the IVC technologies.

Teaching and Learning Technologies (TLT) schedules the conferencing connection of these pre-built rooms for University of Utah-related sessions and can offer technical facilitators to assist with the interactive conference. Use of a facilitator during IVC events is highly recommended, especially for classes.

Go to the List of IVC Facilities for the University of Utah

 

 

 

Powered by Zendesk